Highly efficient 4G processes




WAREHOUSE
The largest stock of raw materials is the beginning to ensure the efficiency of your projects.
- 1,500 m2 raw materials warehouse
CUTTING AND STEEL PREPARATION
We have invested in technology and training to ensure the quality of each rack.
- Cutting of steel
- Laser cutting and plasma CNC
- Bending and press cutting
- Die cutting
- Galvanizing plant
- CNC machining










ASSEMBLE
In 4G nothing stops. Multiple lines working simultaneously 24/7.
- 12 Assembly lines
- Welding MIG
PAINT AND FINAL DRESSING
For 4G every detail is important in the aesthetics of the racks and the necessary equipment in the care of auto parts.
- 3 paint booths
- 5 final dressing lines










DELIVERY LOGISTICS
We make successful deliveries thanks to a large infrastructure dedicated exclusively to meet in time and form.
- 3,600 m2 finished product warehouse
- Units for racking delivery